- Working temperature: 45°C to 55°C for full fitting;
- Curing time: 15–20 minutes for conventional iPad models;
- Pressure control: Uniform surface pressure to avoid local deformation.
- Micro bubbles: Use constant-temperature pressing equipment for secondary pressing;
- Large bubbles: Re-laminate after cleaning residual dust on sensor layer;
- Edge bubbles: Adjust adhesive width and alignment tolerance during assembly.

- Complete natural curing for 24 hours before packaging and delivery;
- Adhesive edge reinforcement for iPad Pro and iPad Air large-size digitizers;
- Strict bending test for FPC cables after lamination.
- 100% visual inspection for lamination effect before shipment;
- Defective products will be isolated and reworked separately;
- Attach process inspection report for large bulk orders.